Difference between revisions of "Apr 18, 2013 SiPM Electrical and Cooling"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 7: | Line 7: | ||
# Announcements | # Announcements | ||
# Action Items | # Action Items | ||
− | # Light guides ( | + | # Light guides (Tina) |
# SiPM production testing (Yi) | # SiPM production testing (Yi) | ||
# Mechanical assembly (Jim) | # Mechanical assembly (Jim) | ||
− | + | # Electronic boards and SiPM sorting (Fernando and Chris) | |
− | # Electronic boards (Fernando and Chris) | + | |
== Minutes == | == Minutes == | ||
''Attending: | ''Attending: |
Revision as of 17:53, 28 February 2013
Action Items from previous meetings
- Nick to send location of files with the SiPM assignment information to Elton and Yi.
Tentative Agenda
- Announcements
- Action Items
- Light guides (Tina)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Electronic boards and SiPM sorting (Fernando and Chris)
Minutes
Attending: