Difference between revisions of "GlueX Start Counter Meeting, January 24, 2013"
From GlueXWiki
(→Minutes) |
(→Minutes: headings) |
||
Line 29: | Line 29: | ||
* '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser | * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser | ||
* '''JLab''': Chuck Hutton, Mark Ito (chair) | * '''JLab''': Chuck Hutton, Mark Ito (chair) | ||
+ | |||
+ | ==Review minutes from previous meeting== | ||
+ | |||
+ | ==Counter Construction== | ||
same numbers from mcneal | same numbers from mcneal | ||
Line 46: | Line 50: | ||
matter of days once order is placed | matter of days once order is placed | ||
chuck will look into shipping assurance | chuck will look into shipping assurance | ||
+ | |||
+ | ==Contract== |
Revision as of 14:20, 28 January 2013
GlueX Start Counter Meeting
Thursday, January 24, 2013
10 am EST
JLab: CEBAF Center L207 (non-standard room)
Contents
Agenda
- Announcements
- Review minutes from previous meeting
- Counter Construction
- SiPM read-out status
- Light collection study status
- Contract
Communication Information
Video Conferencing
- ESNet: 8542553
- SeeVogh
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .
Minutes
Present:
- FIU: Werner Boeglin, Puneet Khetarpal, Eric Pooser
- JLab: Chuck Hutton, Mark Ito (chair)
Review minutes from previous meeting
Counter Construction
same numbers from mcneal cables some cables for testing testing complete test possible 30 counter test as a working assumption five counters from eljen ej 200 strips not ej212 as before dimentsions 3 mm x 5 strips 10:10 with practice runs $196 per scchint width less than 30 mm matter of days once order is placed chuck will look into shipping assurance