Difference between revisions of "Minutes-1-10-2013"
From GlueXWiki
(→Agenda) |
|||
Line 2: | Line 2: | ||
= Agenda = | = Agenda = | ||
− | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_January_10_2012.xlsx Construction Tracking] (Dave) | + | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_January_10_2012.xlsx Construction Tracking] |
− | #* Second package tests | + | #* Production status (Dave) |
+ | #* Second package tests (Lubomir) | ||
#* Basis of Estimate for the FDC [http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_FDC.xlsx activities] ,[http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_guide.docx guideline] (Lubomir) | #* Basis of Estimate for the FDC [http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_FDC.xlsx activities] ,[http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_guide.docx guideline] (Lubomir) | ||
# Corrosion [http://www.jlab.org/Hall-D/detector/fdc/corrosion/Spreadsheet.pdf tests] (Lubomir) | # Corrosion [http://www.jlab.org/Hall-D/detector/fdc/corrosion/Spreadsheet.pdf tests] (Lubomir) |
Revision as of 17:14, 10 January 2013
January 10, 2013 FDC meeting
Agenda
- Production Construction Tracking
- Production status (Dave)
- Second package tests (Lubomir)
- Basis of Estimate for the FDC activities ,guideline (Lubomir)
- Corrosion tests (Lubomir)
- Engineering
- Electronics (Chris, Nick)
- Tests at EEL126 (Lubomir, Beni)
- Other