== Tentative Agenda ==
 
== Tentative Agenda ==
 +
 +
# Announcements
 +
# Action Items
 +
# Schedule for production and testing (all)
 +
# mini-Bcal (Elton)
 +
# SiPM production testing (Yi)
 +
# Mechanical assembly (Jim)
 +
# Temperature compensation (Jack)
 +
# Electronic boards (Fernando and Chris)
 +
# Light guide gluing setup (Scot)
 +
 +
== Minutes ==
 +
''Attending:
  
 
# Announcements
 
# Announcements
Line 23: Line 36:
 
# Electronic boards (Fernando and Chris)
 
# Electronic boards (Fernando and Chris)
 
# Light guide gluing setup (Scot)
 
# Light guide gluing setup (Scot)
 
== Minutes ==
 
''Attending:
 

Revision as of 17:15, 6 December 2012

Action Items from previous meetings

  1. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) Decided to have a separate patch panel, which allows decisions on these other items to a later date
  2. Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim)
  3. Give Jim a U-board with defective SiPM for devising extraction tool (Nick and Yi)
  4. Determine granularity of LED bias and power, as well as multiplicity of trigger signals (Elton)
  5. Check on official releases of the 3D model (Elton and Jim) All items will have a drawing. 3D models will be tagged in directories on the group disk.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule for production and testing (all)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending:

  1. Announcements
  2. Action Items
  3. Schedule for production and testing (all)
    1. Light guides
      • Approximately 1400 have been delivered and 400 more arrived today.
      • Manpower for the gluing has been identified, but will start the week before the break
      • Will check that tooling does the job and start some dry tests before starting. If necessary make any modifications to procedures/setup.
    2. Bcal assemblies (mechanical)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)