Difference between revisions of "Dec 5, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
|||
Line 5: | Line 5: | ||
# <strike> Give Jim a U-board with defective SiPM for devising extraction tool (Nick and Yi) </strike> | # <strike> Give Jim a U-board with defective SiPM for devising extraction tool (Nick and Yi) </strike> | ||
# <strike> Determine granularity of LED bias and power, as well as multiplicity of trigger signals (Elton) </strike> | # <strike> Determine granularity of LED bias and power, as well as multiplicity of trigger signals (Elton) </strike> | ||
− | # Check on official releases of the 3D model (Elton and Jim) | + | # <strike> Check on official releases of the 3D model (Elton and Jim) </strike> All items will have a drawing. 3D models will be tagged in directories on the group disk. |
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 15:25, 6 December 2012
Action Items from previous meetings
-
Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) </strke,> Decided to have a separate patch panel, which allows decisions on these other items to a later date - <strike> Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim) </strke>
- <strike> Give Jim a U-board with defective SiPM for devising extraction tool (Nick and Yi)
-
Determine granularity of LED bias and power, as well as multiplicity of trigger signals (Elton) -
Check on official releases of the 3D model (Elton and Jim)All items will have a drawing. 3D models will be tagged in directories on the group disk.
Tentative Agenda
- Announcements
- Action Items
- Schedule for production and testing (all)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)
Minutes
Attending: