Difference between revisions of "Nov 6, 2012 Calorimetry"
From GlueXWiki
(→Minutes) |
|||
Line 28: | Line 28: | ||
#* Note from Christina: The students are occupying the university tomorrow. Today we set up the fcal measurement and were going to start tomorrow! (They will try to participate via EVO) | #* Note from Christina: The students are occupying the university tomorrow. Today we set up the fcal measurement and were going to start tomorrow! (They will try to participate via EVO) | ||
#* Discussion on signal granularity to Fcal and Bcal monitoring boards. See [https://mailman.jlab.org/pipermail/halld-cal/2012-November/000656.html e-mail] | #* Discussion on signal granularity to Fcal and Bcal monitoring boards. See [https://mailman.jlab.org/pipermail/halld-cal/2012-November/000656.html e-mail] | ||
− | |||
− | |||
− | |||
# FCAL | # FCAL | ||
# USM update | # USM update | ||
Line 49: | Line 46: | ||
#* Note from Christina: The students are occupying the university tomorrow. Today we set up the fcal measurement and were going to start tomorrow! (They will try to participate via EVO) | #* Note from Christina: The students are occupying the university tomorrow. Today we set up the fcal measurement and were going to start tomorrow! (They will try to participate via EVO) | ||
#* Discussion on signal granularity to Fcal and Bcal monitoring boards. See [https://mailman.jlab.org/pipermail/halld-cal/2012-November/000656.html e-mail] | #* Discussion on signal granularity to Fcal and Bcal monitoring boards. See [https://mailman.jlab.org/pipermail/halld-cal/2012-November/000656.html e-mail] | ||
+ | #* We discussed the granularity of the trigger and four signals was the consensus. | ||
+ | #* We discussed the granularity of the bias/power signals and several was the consensus. | ||
+ | #* Elton agreed to circulate a concrete plan for feedback, so that something could be included into the ETC request if necessary. | ||
# FCAL | # FCAL | ||
# USM update | # USM update |
Revision as of 18:42, 6 November 2012
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Fcal
-
Add beam hole for the ABS upstream cover. (Matt)
-
- Simulation
- Add up-to-date geometry for plexiglass pane and TOF detector and rerun simulation to check photon reconstruction (Elton to see if Beni or Richard can add the geometry)
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- Note from Christina: The students are occupying the university tomorrow. Today we set up the fcal measurement and were going to start tomorrow! (They will try to participate via EVO)
- Discussion on signal granularity to Fcal and Bcal monitoring boards. See e-mail
- FCAL
- USM update
- BCAL
- Simulations
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- Calibration of Calorimeters
- Any other business
Minutes
Attendees:John, Dan, Elton, Yi, Ivan, David (JLab); Will, Hayk, Francisco, Alan (USM); Christina, George (Athens); Zisis, Andrei (UofR); Matt (IU).
- Announcements
- Review of Action Items
- Monitoring
- Note from Christina: The students are occupying the university tomorrow. Today we set up the fcal measurement and were going to start tomorrow! (They will try to participate via EVO)
- Discussion on signal granularity to Fcal and Bcal monitoring boards. See e-mail
- We discussed the granularity of the trigger and four signals was the consensus.
- We discussed the granularity of the bias/power signals and several was the consensus.
- Elton agreed to circulate a concrete plan for feedback, so that something could be included into the ETC request if necessary.
- FCAL
- USM update
- BCAL
- Simulations
- TDR update
- Calibration of Calorimeters
- Any other business