(Action Items from previous meetings)
(Action Items from previous meetings)
Line 3: Line 3:
 
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
 
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
 
# Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack)
 
# Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack)
 +
# Provide feedback to Fernando on his readout assembly schedule (Elton and Jim)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 17:52, 20 September 2012

Action Items from previous meetings

  1. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
  2. Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack)
  3. Provide feedback to Fernando on his readout assembly schedule (Elton and Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending: