(Created page with "== Action Items from previous meetings == # Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elto...")
 
(Action Items from previous meetings)
Line 3: Line 3:
 
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
 
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
 
# Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
 
# Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
 +
# Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 16:48, 13 September 2012

Action Items from previous meetings

  1. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
  2. Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
  3. Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending: