Difference between revisions of "July 26, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
Line 2: Line 2:
  
 
# Develop front and back views of jumper sheets.  (Jack)
 
# Develop front and back views of jumper sheets.  (Jack)
# Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
+
# <strike> Check into AC units based on Peltier coolers for SiPM production tests (Fernando) </strike> See
# Review Fcal LED and controller monitoring boards (Fernando)
+
# * [http://www.tripplite.com/en/products/model.cfm?txtSeriesID=759&txtModelID=4462] and [http://rackmountsolutions.net/movincool-portable-air-conditioners.asp]
# Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack)
+
# <strike> Review Fcal LED and controller monitoring boards (Fernando) </strike>
# Complete molds for wrapping and order forms (Jim)
+
# <strike> Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack) </strike>
# Thermal mats need to be ordered (Jim said that Fernando or Chris will take care of this)
+
# <strike> Complete molds for wrapping and order forms (Jim) </strike> Elton to test wrapping forms.
# Cooling tubes need to be brazed in (Jim?)
+
# <strike> Thermal mats need to be ordered (Jim said that Fernando or Chris will take care of this) </strike>
# Circuit board and micro-Dsub connector for monitoring system needs to be completed (Chris and Jim)
+
# <strike> Cooling tubes need to be brazed in (Jim?) </strike> Bending and brazing tubes in progress
 +
# <strike> Circuit board and micro-Dsub connector for monitoring system needs to be completed (Chris and Jim) </strike>
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==
Line 23: Line 24:
  
 
== Minutes ==
 
== Minutes ==
''Attending:
+
''Attending: Elton, Fernando, Yi, Chris, Nick, Scot
 +
 
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
#* Light guide schedule: Two sets are promised for shipping tomorrow. Once in production, USM expects to be able to produce many sets per week.
 +
# SiPM production testing (everyone)
 +
#* SiPMs assignment for new boards
 +
# Mechanical assembly (Jim)
 +
# Temperature compensation (Jack)
 +
# Electronic boards (Chris)
 +
# Light guide gluing setup

Revision as of 16:22, 26 July 2012

Action Items from previous meetings

  1. Develop front and back views of jumper sheets. (Jack)
  2. Check into AC units based on Peltier coolers for SiPM production tests (Fernando) See
  3. * [1] and [2]
  4. Review Fcal LED and controller monitoring boards (Fernando)
  5. Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack)
  6. Complete molds for wrapping and order forms (Jim) Elton to test wrapping forms.
  7. Thermal mats need to be ordered (Jim said that Fernando or Chris will take care of this)
  8. Cooling tubes need to be brazed in (Jim?) Bending and brazing tubes in progress
  9. Circuit board and micro-Dsub connector for monitoring system needs to be completed (Chris and Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup

Minutes

Attending: Elton, Fernando, Yi, Chris, Nick, Scot

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
    • Light guide schedule: Two sets are promised for shipping tomorrow. Once in production, USM expects to be able to produce many sets per week.
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup