Line 2: | Line 2: | ||
# Develop front and back views of jumper sheets. (Jack) | # Develop front and back views of jumper sheets. (Jack) | ||
− | # Check into AC units based on Peltier coolers for SiPM production tests (Fernando) | + | # <strike> Check into AC units based on Peltier coolers for SiPM production tests (Fernando) </strike> See |
− | # Review Fcal LED and controller monitoring boards (Fernando) | + | # * [http://www.tripplite.com/en/products/model.cfm?txtSeriesID=759&txtModelID=4462] and [http://rackmountsolutions.net/movincool-portable-air-conditioners.asp] |
− | # Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack) | + | # <strike> Review Fcal LED and controller monitoring boards (Fernando) </strike> |
− | # Complete molds for wrapping and order forms (Jim) | + | # <strike> Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack) </strike> |
− | # Thermal mats need to be ordered (Jim said that Fernando or Chris will take care of this) | + | # <strike> Complete molds for wrapping and order forms (Jim) </strike> Elton to test wrapping forms. |
− | # Cooling tubes need to be brazed in (Jim?) | + | # <strike> Thermal mats need to be ordered (Jim said that Fernando or Chris will take care of this) </strike> |
− | # Circuit board and micro-Dsub connector for monitoring system needs to be completed (Chris and Jim) | + | # <strike> Cooling tubes need to be brazed in (Jim?) </strike> Bending and brazing tubes in progress |
+ | # <strike> Circuit board and micro-Dsub connector for monitoring system needs to be completed (Chris and Jim) </strike> | ||
== Tentative Agenda == | == Tentative Agenda == | ||
Line 23: | Line 24: | ||
== Minutes == | == Minutes == | ||
− | ''Attending: | + | ''Attending: Elton, Fernando, Yi, Chris, Nick, Scot |
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Schedule, reporting, and manpower (Elton) | ||
+ | #* Light guide schedule: Two sets are promised for shipping tomorrow. Once in production, USM expects to be able to produce many sets per week. | ||
+ | # SiPM production testing (everyone) | ||
+ | #* SiPMs assignment for new boards | ||
+ | # Mechanical assembly (Jim) | ||
+ | # Temperature compensation (Jack) | ||
+ | # Electronic boards (Chris) | ||
+ | # Light guide gluing setup |
Revision as of 16:22, 26 July 2012
Action Items from previous meetings
- Develop front and back views of jumper sheets. (Jack)
-
Check into AC units based on Peltier coolers for SiPM production tests (Fernando)See - * [1] and [2]
-
Review Fcal LED and controller monitoring boards (Fernando) -
Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack) -
Complete molds for wrapping and order forms (Jim)Elton to test wrapping forms. -
Thermal mats need to be ordered (Jim said that Fernando or Chris will take care of this) -
Cooling tubes need to be brazed in (Jim?)Bending and brazing tubes in progress -
Circuit board and micro-Dsub connector for monitoring system needs to be completed (Chris and Jim)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)
- Light guide gluing setup
Minutes
Attending: Elton, Fernando, Yi, Chris, Nick, Scot
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- Light guide schedule: Two sets are promised for shipping tomorrow. Once in production, USM expects to be able to produce many sets per week.
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)