Difference between revisions of "Jul 17, 2012 Calorimetry"
From GlueXWiki
(→Items for followup from previous meeting(s)) |
|||
Line 18: | Line 18: | ||
# Fcal | # Fcal | ||
− | #* When to ship structure to JLab? (Elton and Tim to review schedule) | + | #* <strike> When to ship structure to JLab? (Elton and Tim to review schedule) </strike> Should be ready by mid to late August. |
# SiPMs | # SiPMs | ||
− | #* Show distribution of response uniformity of all SiPMs compared to specifications. | + | #* <strike> Show distribution of response uniformity of all SiPMs compared to specifications. </strike> See today's presentation |
= Tentative Agenda = | = Tentative Agenda = |
Revision as of 16:38, 17 July 2012
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Fcal
-
When to ship structure to JLab? (Elton and Tim to review schedule)Should be ready by mid to late August.
-
- SiPMs
-
Show distribution of response uniformity of all SiPMs compared to specifications.See today's presentation
-
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- LED system on Mini BCAL
- FCAL
- Construction Status
- 2011 Hall B FCAL Beam Test (John)
- BCAL
- Activities at JLab (Module positioning, SiPM binning, LG Travellers)
- Cosmics at Regina
- Update on BCAL Beam Tests 2012
- USM update
- SiPM Update (Javiera)
- Working Point Analysis (Orlando)
- Light guides (Iñaki)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Calibration of Calorimeters
- Simulations/Reconstruction
- BCAL Simulation Status Update (David)
- Any other business
Minutes
Attendees: David, Beni, Tara, Elton, Yi, John L. (Jlab); Zisis, Andrei (UofR); George, Stratos, Christina (Athens); Javiera, Orlando, Alam, Iñaki (USM); Matt (IU)
- Announcements
- Review of Action Items
- Monitoring
- LED system on Mini BCAL
- FCAL
- Construction Status
- 2011 Hall B FCAL Beam Test (John)
- BCAL
- Activities at JLab (Module positioning, SiPM binning, LG Travellers)
- Cosmics at Regina
- Update on BCAL Beam Tests 2012
- USM update
- SiPM Update (Javiera)
- Working Point Analysis (Orlando)
- Light guides (Iñaki)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Calibration of Calorimeters
- Simulations/Reconstruction
- BCAL Simulation Status Update (David)
- Any other business