Difference between revisions of "Jul 17, 2012 Calorimetry"
From GlueXWiki
Line 50: | Line 50: | ||
=Minutes= | =Minutes= | ||
− | ''Attendees: | + | ''Attendees: David, Beni, Tara, Elton, Yi, John L. (Jlab); Zisis, Andrei (UofR); George, Stratos, Christina (Athens); Javiera, Orlando, Alam, Iñaki (USM); Matt (IU) |
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | # Monitoring | ||
+ | ## LED system on Mini BCAL | ||
+ | ##* [[Media:Mini_BCAL.pdf|LED System, 2012 Calorimetry]] | ||
+ | # FCAL | ||
+ | ## Construction Status | ||
+ | ## [[2011 Hall B FCAL Beam Test]] (John) | ||
+ | # BCAL | ||
+ | ## Activities at JLab (Module positioning, SiPM binning, LG Travellers) | ||
+ | ## Cosmics at Regina | ||
+ | ## Update on [[BCAL Beam Tests 2012]] | ||
+ | # USM update | ||
+ | ## [[Media:USMReport22.pdf|SiPM Update]] (Javiera) | ||
+ | ## [[Media:Working_point_analysis_dos.pdf|Working Point Analysis]] (Orlando) | ||
+ | ## [[Media:USM_Light_guides_status.pdf|Light guides]] (Iñaki) | ||
+ | # TDR update | ||
+ | ## [[Private:Instructions for the TDR | Instructions for the TDR]] (You must be logged into the wiki to access this page). | ||
+ | ## We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry. | ||
+ | ## Calibration of Calorimeters | ||
+ | # Simulations/Reconstruction | ||
+ | #* [[Media:20120717_bcal_simulation.pdf|BCAL Simulation Status Update]] (David) | ||
+ | # Any other business |
Revision as of 16:37, 17 July 2012
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Fcal
- When to ship structure to JLab? (Elton and Tim to review schedule)
- SiPMs
- Show distribution of response uniformity of all SiPMs compared to specifications.
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- LED system on Mini BCAL
- FCAL
- Construction Status
- 2011 Hall B FCAL Beam Test (John)
- BCAL
- Activities at JLab (Module positioning, SiPM binning, LG Travellers)
- Cosmics at Regina
- Update on BCAL Beam Tests 2012
- USM update
- SiPM Update (Javiera)
- Working Point Analysis (Orlando)
- Light guides (Iñaki)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Calibration of Calorimeters
- Simulations/Reconstruction
- BCAL Simulation Status Update (David)
- Any other business
Minutes
Attendees: David, Beni, Tara, Elton, Yi, John L. (Jlab); Zisis, Andrei (UofR); George, Stratos, Christina (Athens); Javiera, Orlando, Alam, Iñaki (USM); Matt (IU)
- Announcements
- Review of Action Items
- Monitoring
- LED system on Mini BCAL
- FCAL
- Construction Status
- 2011 Hall B FCAL Beam Test (John)
- BCAL
- Activities at JLab (Module positioning, SiPM binning, LG Travellers)
- Cosmics at Regina
- Update on BCAL Beam Tests 2012
- USM update
- SiPM Update (Javiera)
- Working Point Analysis (Orlando)
- Light guides (Iñaki)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Calibration of Calorimeters
- Simulations/Reconstruction
- BCAL Simulation Status Update (David)
- Any other business