Difference between revisions of "BLTWG Meeting 07/09/2012"
From GlueXWiki
(Created page with "* Time: 11:30 EST * Place: ESNET and EVO (with telephone bridge id 555 2690) * Connecting: instructions are here * Present: ---- ===Agen...") |
(→Agenda) |
||
Line 9: | Line 9: | ||
#* June 3 -- Solicitation received at UConn ! | #* June 3 -- Solicitation received at UConn ! | ||
#* June 20 -- Response from UConn to solicitation | #* June 20 -- Response from UConn to solicitation | ||
− | # Requirements for low current operation -- ''Liping'' | + | # [http://zeus.phys.uconn.edu/halld/tagger/lowcurrent-7-2012/Photon-Flux-Gan.pptx Requirements for low current operation] -- ''Liping'' |
# Study of the fixed tagger array geometry -- ''Dan'' | # Study of the fixed tagger array geometry -- ''Dan'' | ||
# Report from Glasgow group -- ''Ken'' | # Report from Glasgow group -- ''Ken'' |
Revision as of 10:56, 9 July 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 555 2690)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- Progress on UConn construction contract -- Richard
- June 3 -- Solicitation received at UConn !
- June 20 -- Response from UConn to solicitation
- Requirements for low current operation -- Liping
- Study of the fixed tagger array geometry -- Dan
- Report from Glasgow group -- Ken
- Report from ASU group -- Mike
- Update on microscope construction -- James
- possible loan of DAq system with FADC to UConn
- possible swap of two SIPM's with Jlab (soon??)