# Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack)
 
# Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack)
 
# Complete molds for wrapping and order forms (Jim)
 
# Complete molds for wrapping and order forms (Jim)
 +
# Thermal mats need to be ordered (Jim said that Fernando or Chris will take care of this)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 16:17, 5 July 2012

Action Items from previous meetings

  1. Develop front and back views of jumper sheets. (Jack)
  2. Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
  3. Review Fcal LED and controller monitoring boards (Fernando)
  4. Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack)
  5. Complete molds for wrapping and order forms (Jim)
  6. Thermal mats need to be ordered (Jim said that Fernando or Chris will take care of this)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup

Minutes

Attending: