Revision as of 10:26, 3 July 2012
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Cables
-
Establish cabling for Bcal and Fcal into racksFiles sent to Fernando
-
- Mechanical
-
Check features in Fcal support structure for cable passages and plexiglas support, and space between window frames on glass and plexiglass (Elton, Tim)Appears that the 3 1.5" holes are adequate.
-
- Monitoring
-
Check status of monitoring control boards at JLab (David).
-
- Contracts
-
no-cost schedule extension for Fcal (Elton)Extension has been signed.
-
- SiPMs
-
Evaluate amount of spare SiPM needed to tack onto the present USM orderA full inventory has been conducted. In addition to the 48 units and 1 mini-Bcal, we are short several units to instrument one more module even if all sensors that have been lent our are returned to JLab.
-
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- LED system on Mini BCAL
- FCAL
- Construction Status
- Arrival of Steel Frame: FCALPhotos
- 2011 Hall B FCAL Beam Test (John)
- FCAL PMT Testing Results (Kei)
- Construction Status
- BCAL
- Cosmics at Regina
- Cosmics run plan (SiPMs) & LEDs at JLab
- Update on BCAL Beam Tests 2012
- USM update
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Calibration of Calorimeters
- Simulations/Reconstruction
- Any other business
Minutes
Attendees: