Difference between revisions of "Minutes-6-28-2012"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 3: | Line 3: | ||
= Agenda = | = Agenda = | ||
# [http://www.jlab.org/Hall-D/detector/fdc/drawings/CABLE_ROUTING_INSTALLATION.pptx FDC installation and cable routing] (Tom Carstens) | # [http://www.jlab.org/Hall-D/detector/fdc/drawings/CABLE_ROUTING_INSTALLATION.pptx FDC installation and cable routing] (Tom Carstens) | ||
− | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/ | + | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Jun_28_2012.xlsx Construction Tracking] (Dave) |
#* Production status | #* Production status | ||
#* Other: package transportation, subsystem installations | #* Other: package transportation, subsystem installations |
Revision as of 16:11, 27 June 2012
June 28, 2012 FDC meeting
Agenda
- FDC installation and cable routing (Tom Carstens)
- Production Construction Tracking (Dave)
- Production status
- Other: package transportation, subsystem installations
- Engineering update
- Cooling system
- Electronics update (Chris)
- Cable assignment (Vlad)
- Gas system (Beni)
- Test set-up in 126 (Beni)
- Cathode tests of the first package (Vlad)
- Other