Difference between revisions of "Controls Meeting 19-Apr-2012"
From GlueXWiki
(Created page with "=Agenda= * Announcements * Minutes from previous meeting 5-Apr-2012 * [http://halldweb1.jlab.org/JInventory JInventory database] and EMI specs - ...") |
m |
||
Line 2: | Line 2: | ||
* Announcements | * Announcements | ||
+ | ** summer students and new Mantis tasks | ||
* Minutes from previous meeting [[Controls_Meeting_5-Apr-2012|5-Apr-2012]] | * Minutes from previous meeting [[Controls_Meeting_5-Apr-2012|5-Apr-2012]] | ||
− | |||
* Danfysik tutorial - Sarin Philip | * Danfysik tutorial - Sarin Philip | ||
+ | * Stepper motor control - Vanik | ||
* EPICS - Hovanes, Vanik | * EPICS - Hovanes, Vanik | ||
− | ** | + | ** alarm system, goniometer, UConn boards, other power supplies, etc. |
− | + | ||
− | + | ||
* Counting house installation - Hovanes, Mark | * Counting house installation - Hovanes, Mark | ||
* [[Solenoid_Controls_Redesign]] - Mark, Josh, Scot, Yi, Elliott | * [[Solenoid_Controls_Redesign]] - Mark, Josh, Scot, Yi, Elliott | ||
− | ** UPS power to Danfysik, coil taps and PXI, SOE, QD, shunt replacement, ground fault detector, etc. | + | ** FMEA, UPS power to Danfysik, coil taps and PXI, SOE, QD, shunt replacement, ground fault detector, etc. |
+ | * [http://halldweb1.jlab.org/JInventory JInventory database] - Elliott | ||
+ | ** EMI specs | ||
+ | ** cables | ||
+ | ** barcode scanner | ||
+ | ** hierarchical data | ||
* Test stand - Hovanes, Josh | * Test stand - Hovanes, Josh | ||
* PLC programming - Josh | * PLC programming - Josh | ||
Line 19: | Line 23: | ||
* Experiment Control Supervisor - Elliott | * Experiment Control Supervisor - Elliott | ||
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker] | * [http://halldweb1.jlab.org/mantisbt Mantis task tracker] | ||
+ | |||
Revision as of 16:42, 17 April 2012
Agenda
- Announcements
- summer students and new Mantis tasks
- Minutes from previous meeting 5-Apr-2012
- Danfysik tutorial - Sarin Philip
- Stepper motor control - Vanik
- EPICS - Hovanes, Vanik
- alarm system, goniometer, UConn boards, other power supplies, etc.
- Counting house installation - Hovanes, Mark
- Solenoid_Controls_Redesign - Mark, Josh, Scot, Yi, Elliott
- FMEA, UPS power to Danfysik, coil taps and PXI, SOE, QD, shunt replacement, ground fault detector, etc.
- JInventory database - Elliott
- EMI specs
- cables
- barcode scanner
- hierarchical data
- Test stand - Hovanes, Josh
- PLC programming - Josh
- Elogs and databases - Elliott
- Midas elog
- Operator elog
- Experiment Control Supervisor - Elliott
- Mantis task tracker
Time/Location
9:30 AM Thurs 19-Apr-2012 CC L207
Announcements
Next Meeting
9:30am 3-May-2012 CC L207