Difference between revisions of "Minutes-3-1-2012"
From GlueXWiki
(Created page with "March 1, 2012 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_March_1_2012.xlsx Construction Tracking] (Dave) #* Produc...") |
(→Agenda) |
||
Line 6: | Line 6: | ||
#* Production status | #* Production status | ||
#* Testing at Blue Crab (Lubomir) | #* Testing at Blue Crab (Lubomir) | ||
− | # Oxygen contamination in the first package: monitoring results, possible explanation and options to reduce it [https://halldweb1.jlab.org/elog-halld/FDC/ FDC ELOG] (Beni, Lubomir) | + | # Oxygen contamination in the first package: monitoring results, possible explanation and options to reduce it [https://halldweb1.jlab.org/elog-halld/FDC/ FDC ELOG] (Beni, Bill, Lubomir) |
# Engineering update (Bill) | # Engineering update (Bill) | ||
# Electronics update (Chris) | # Electronics update (Chris) |
Revision as of 19:12, 29 February 2012
March 1, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Production status
- Testing at Blue Crab (Lubomir)
- Oxygen contamination in the first package: monitoring results, possible explanation and options to reduce it FDC ELOG (Beni, Bill, Lubomir)
- Engineering update (Bill)
- Electronics update (Chris)
- Other