Difference between revisions of "Minutes-3-1-2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "March 1, 2012 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_March_1_2012.xlsx Construction Tracking] (Dave) #* Produc...")
 
(Agenda)
Line 6: Line 6:
 
#* Production status
 
#* Production status
 
#* Testing at Blue Crab (Lubomir)
 
#* Testing at Blue Crab (Lubomir)
# Oxygen contamination in the first package: monitoring results, possible explanation and options to reduce it  [https://halldweb1.jlab.org/elog-halld/FDC/ FDC ELOG] (Beni, Lubomir)
+
# Oxygen contamination in the first package: monitoring results, possible explanation and options to reduce it  [https://halldweb1.jlab.org/elog-halld/FDC/ FDC ELOG] (Beni, Bill, Lubomir)
 
# Engineering update (Bill)  
 
# Engineering update (Bill)  
 
# Electronics update (Chris)
 
# Electronics update (Chris)

Revision as of 19:12, 29 February 2012

March 1, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Production status
    • Testing at Blue Crab (Lubomir)
  2. Oxygen contamination in the first package: monitoring results, possible explanation and options to reduce it FDC ELOG (Beni, Bill, Lubomir)
  3. Engineering update (Bill)
  4. Electronics update (Chris)
  5. Other