Difference between revisions of "Jan 5, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(Created page with "== Action Items from previous meetings == == Tentative Agenda == # Announcements # Action Items # Schedule, reporting, and manpower (Elton) # SiPM production testing (everyone)...") |
(→Tentative Agenda) |
||
Line 7: | Line 7: | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
# SiPM production testing (everyone) | # SiPM production testing (everyone) | ||
− | |||
# Mechanical assembly (Scot) | # Mechanical assembly (Scot) | ||
# Mechanical (Jim) | # Mechanical (Jim) | ||
Line 13: | Line 12: | ||
# Temperature compensation (Jack) | # Temperature compensation (Jack) | ||
# Preamp-summing (Fernando/Chris) | # Preamp-summing (Fernando/Chris) | ||
+ | |||
+ | # SiPM testing (Ivan) | ||
== Minutes == | == Minutes == | ||
''Attending: | ''Attending: |
Revision as of 18:44, 4 January 2012
Action Items from previous meetings
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando/Chris)
- SiPM testing (Ivan)
Minutes
Attending: