Difference between revisions of "November 18, 2011 Design Meeting"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 8: | Line 8: | ||
** Walkthrough punchlist/Beneficial occupancy - Dec 1 | ** Walkthrough punchlist/Beneficial occupancy - Dec 1 | ||
** Hall D open house Dec 2 | ** Hall D open house Dec 2 | ||
+ | ** Vacation Donation | ||
** Presentations available M:\halld\Engineering\Presentations | ** Presentations available M:\halld\Engineering\Presentations | ||
** training - up to date? | ** training - up to date? | ||
* CAD update | * CAD update | ||
* Upstream platform install Status - Tom | * Upstream platform install Status - Tom | ||
+ | * Solenoid Install/Interface | ||
* FDC construction update - Bill | * FDC construction update - Bill | ||
* Large Vacuum chamber specs | * Large Vacuum chamber specs | ||
Line 18: | Line 20: | ||
* Collimator beamline update | * Collimator beamline update | ||
* Downstream/Solenoid Platforms update | * Downstream/Solenoid Platforms update | ||
+ | * Electrical - Giles | ||
* Mock up update - | * Mock up update - | ||
* Spare solenoid | * Spare solenoid | ||
Line 27: | Line 30: | ||
* Get with Tom on Beamline fab tasks - Slava | * Get with Tom on Beamline fab tasks - Slava | ||
* Post .pdf manpower assignments on M drive - Tim | * Post .pdf manpower assignments on M drive - Tim | ||
+ | * Update Hall D/Tagger COO - Tom/Tim | ||
==Minutes== | ==Minutes== |
Latest revision as of 08:46, 18 November 2011
Friday Nov 18, 2011 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231
Agenda
- ESH&Q minute - animal safety
- Announcements
- Appraisals status
- Walkthrough punchlist/Beneficial occupancy - Dec 1
- Hall D open house Dec 2
- Vacation Donation
- Presentations available M:\halld\Engineering\Presentations
- training - up to date?
- CAD update
- Upstream platform install Status - Tom
- Solenoid Install/Interface
- FDC construction update - Bill
- Large Vacuum chamber specs
- Target update
- BCAL readout update
- Collimator beamline update
- Downstream/Solenoid Platforms update
- Electrical - Giles
- Mock up update -
- Spare solenoid
- Fabrication/installation work - Tom
Outstanding Action Items
- Discuss with Eugene who owner of Counting house will be - Hovannes has been assigned
- Get with Tom on Beamline fab tasks - Slava
- Post .pdf manpower assignments on M drive - Tim
- Update Hall D/Tagger COO - Tom/Tim
Minutes
- In attendance W. Crahen, J. Fochtman, V. Razmyslovich, J. Lagner, G. Browns, R. Getz, W. Sachleben, Tim Whitlatch, J. Conger, C. Hutton