Difference between revisions of "Sep 1, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Minutes) |
|||
Line 29: | Line 29: | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
# SiPM testing (everyone) | # SiPM testing (everyone) | ||
− | # | + | ## Light source / optics |
− | # | + | ## Electronic boards |
− | # | + | ## Cabling |
− | # | + | ## Cooling plate |
− | # | + | ## Other? |
# Mechanical (Jim) | # Mechanical (Jim) | ||
# Mechanical drawings (Chuck) | # Mechanical drawings (Chuck) |
Revision as of 16:35, 1 September 2011
Action Items from previous meetings
- Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando).
- Order pulse generator (Fernando)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM testing (everyone)
- Light source / optics
- Electronic boards
- Cabling
- Cooling plate
- Other?
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Geometry (Elton)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
- Granularity (Elton)
Minutes
Attending: Carl, Chris, Jim, Fernando, Elton, Jack, Yi, Chuck
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM testing (everyone)
- Light source / optics
- Electronic boards
- Cabling
- Cooling plate
- Other?
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Geometry (Elton)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
- Granularity (Elton)