Difference between revisions of "Sep 1, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
 
Line 23: Line 23:
  
 
== Minutes ==
 
== Minutes ==
''Attending:
+
''Attending: Carl, Chris, Jim, Fernando, Elton, Jack, Yi, Chuck
 +
 
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# SiPM testing (everyone)
 +
#* Light source / optics
 +
#* Electronic boards
 +
#* Cabling
 +
#* Cooling plate
 +
#* Other?
 +
# Mechanical (Jim)
 +
# Mechanical drawings (Chuck)
 +
# Geometry (Elton)
 +
# Temperature compensation (Jack)
 +
# Preamp-summing (Fernando)
 +
# Granularity (Elton)

Revision as of 16:34, 1 September 2011

Action Items from previous meetings

  1. Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando).
  2. Order pulse generator (Fernando)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (everyone)
    • Light source / optics
    • Electronic boards
    • Cabling
    • Cooling plate
    • Other?
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
  10. Granularity (Elton)

Minutes

Attending: Carl, Chris, Jim, Fernando, Elton, Jack, Yi, Chuck

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (everyone)
    • Light source / optics
    • Electronic boards
    • Cabling
    • Cooling plate
    • Other?
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
  10. Granularity (Elton)