− | ''Attending: | + | ''Attending: Carl, Chris, Jim, Chuck, Yi, Elton, Jack, Eugene, Fernando |
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Schedule, reporting, and manpower (Elton) | ||
+ | # SiPM testing (everyone) | ||
+ | #* Light source / optics | ||
+ | #* Electronic boards | ||
+ | #* Cabling | ||
+ | #* Cooling plate | ||
+ | #* Other? | ||
+ | # Mechanical (Jim) | ||
+ | # Mechanical drawings (Chuck) | ||
+ | # Geometry (Elton) | ||
+ | # Temperature compensation (Jack) | ||
+ | # Preamp-summing (Fernando) | ||
+ | # Granularity (Elton) |
Revision as of 17:24, 25 August 2011
Action Items from previous meetings
-
Add hardware voltage limits to bias circuit (Jack)Investigation in progress - Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando).
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM testing (everyone)
- Light source / optics
- Electronic boards
- Cabling
- Cooling plate
- Other?
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Geometry (Elton)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
- Granularity (Elton)
Minutes
Attending: Carl, Chris, Jim, Chuck, Yi, Elton, Jack, Eugene, Fernando
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM testing (everyone)
- Light source / optics
- Electronic boards
- Cabling
- Cooling plate
- Other?
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Geometry (Elton)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
- Granularity (Elton)