Difference between revisions of "Aug 11, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 2: | Line 2: | ||
# Add hardware voltage limits to bias circuit (Jack) | # Add hardware voltage limits to bias circuit (Jack) | ||
− | # Reset devices when communication errors are encountered in control loop (Yi) | + | # <strike> Reset devices when communication errors are encountered in control loop (Yi) </strike> |
− | # Send Jim the dxf file of the U board with the new capacitors to check mechanical fit. (Chris) | + | # <strike> Send Jim the dxf file of the U board with the new capacitors to check mechanical fit. (Chris) </strike> |
− | # Hood in EEL 126 is being removed (Jack will check on status) | + | # <strike> Hood in EEL 126 is being removed (Jack will check on status) </strike> |
# Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando). | # Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando). | ||
Revision as of 13:54, 12 August 2011
Action Items from previous meetings
- Add hardware voltage limits to bias circuit (Jack)
-
Reset devices when communication errors are encountered in control loop (Yi) -
Send Jim the dxf file of the U board with the new capacitors to check mechanical fit. (Chris) -
Hood in EEL 126 is being removed (Jack will check on status) - Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando).
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM testing (Carl and Yi)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Geometry (Elton)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
- Granularity (Elton)
Minutes
Attending: