Difference between revisions of "Aug 11, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
 
(Action Items from previous meetings)
Line 2: Line 2:
  
 
# Add hardware voltage limits to bias circuit (Jack)
 
# Add hardware voltage limits to bias circuit (Jack)
 +
# Reset devices when communication errors are encountered in control loop (Yi)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 16:46, 4 August 2011

Action Items from previous meetings

  1. Add hardware voltage limits to bias circuit (Jack)
  2. Reset devices when communication errors are encountered in control loop (Yi)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (Carl and Yi)
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)

Minutes

Attending: