Difference between revisions of "Minutes-7-21-2011"

From GlueXWiki
Jump to: navigation, search
(No difference)

Revision as of 12:24, 21 July 2011

July 14, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • Wire deadening
  2. Engineering (Bill)
    • Flatness problem: package strongback, gusset rings
    • Stringing table modifications
  3. Electronics (Chris)
    • HV tests
    • Other
  4. Chamber testing at EEL126
    • First cell tests with fADC: cathode resolution(Lubomir)
    • Tests with external tracking (Beni)
  5. Other: naming convention