Difference between revisions of "Jul 7, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Action Items from previous meetings) |
||
Line 4: | Line 4: | ||
# Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories. | # Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories. | ||
# Check the possibility of enlarging the 4-40 screws to hold the cooling plate (Jim) | # Check the possibility of enlarging the 4-40 screws to hold the cooling plate (Jim) | ||
+ | # Update the light guide drawings to eliminate the flat section (Chuck) | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 18:04, 30 June 2011
Action Items from previous meetings
- Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories.
- Check the possibility of enlarging the 4-40 screws to hold the cooling plate (Jim)
- Update the light guide drawings to eliminate the flat section (Chuck)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM testing (Carl and Yi)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Geometry (Elton)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
Minutes
Attending: