Difference between revisions of "Coil Test Weekly Meeting 10-Jun-2011"

From GlueXWiki
Jump to: navigation, search
m
m
Line 18: Line 18:
 
** cooldown timeline
 
** cooldown timeline
 
** subcoil inductances and quench detector
 
** subcoil inductances and quench detector
*** Floyd's spreadsheet lists for 2a,b,c,d: 1.08501, 0.6312, 0.66625, 0.92144 H
+
*** Floyd's spreadsheet for modified taps lists inductance for 2 a,b,c,d: 1.08501, 0.6312, 0.66625, 0.92144 H
 
** Danfysik fault sequencer and slow dump
 
** Danfysik fault sequencer and slow dump
 
** additional PLC and HMI programming
 
** additional PLC and HMI programming

Revision as of 13:55, 9 June 2011

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 10-Jun-2011 9:30 am ARC 231


Agenda

  • Close out P6 solenoid task
    • is everything ordered?
  • Lessons learned from Coil 3
    • do we need to add or change anything?
  • Coil 2 status
    • installation status
    • hi-pot results
    • cooldown timeline
    • subcoil inductances and quench detector
      • Floyd's spreadsheet for modified taps lists inductance for 2 a,b,c,d: 1.08501, 0.6312, 0.66625, 0.92144 H
    • Danfysik fault sequencer and slow dump
    • additional PLC and HMI programming
      • network loss problem?
    • fast DAQ
    • replace smaller UPS
    • anything else?
  • Documentation
    • trip chains
    • anything else?
  • Will there be any auxiliary tests?
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • IRMIS at JLab
    • filled with BNL "training" data
  • Order all controls equipment so project line can be closed out
  • Mantis Task Tracker
  • Preparing for moving into the hall