Difference between revisions of "Jun 9, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Action Items from previous meetings) |
||
Line 4: | Line 4: | ||
# Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories. | # Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories. | ||
+ | # Jim will order the mechanical cover so that the Lemo connections can be checked for rigidity | ||
# Jim to send information about larger cables which could be used for connections between the U-board and the preamp. | # Jim to send information about larger cables which could be used for connections between the U-board and the preamp. | ||
Revision as of 17:17, 2 June 2011
References
Action Items from previous meetings
- Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories.
- Jim will order the mechanical cover so that the Lemo connections can be checked for rigidity
- Jim to send information about larger cables which could be used for connections between the U-board and the preamp.
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM testing (Carl and Yi)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Geometry (Elton)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
Minutes
Attending: