− | 1). Simon has checked the cosmic chamber signals now that alcohol | + | 1). Cosmic Ray Chambers: |
+ | Simon has checked the cosmic chamber signals now that alcohol | ||
has been added. Things look much better now. Several chambers | has been added. Things look much better now. Several chambers | ||
are being read out and a crude calibration is in place. More | are being read out and a crude calibration is in place. More | ||
work will be done when Simon gets back from vacation. | work will be done when Simon gets back from vacation. | ||
− | 2). Comparison of chamber resolution with stretched cathodes shows now | + | 2). Small-Scale Prototype: |
+ | Comparison of chamber resolution with stretched cathodes shows now | ||
change from before (i.e. compared to the old wrinkled planes). | change from before (i.e. compared to the old wrinkled planes). | ||
− | 3). Brian showed his first mechanical drawing. Not much to talk about | + | 3). Mechanical Drawings: |
+ | Brian showed his first mechanical drawing. Not much to talk about | ||
as drawing was 0th order. Brian will continue to work on this. | as drawing was 0th order. Brian will continue to work on this. | ||
− | 4). Brian suggested that we discuss the FDC budget for next year at | + | 4). FDC Budget: |
− | + | - Brian suggested that we discuss the FDC budget for next year at | |
− | + | our next FDC meeting. We can then decide what we want to purchase. | |
+ | - DSC will send Brian the R&D budget numbers after the meeting. | ||
− | 5). DSC reviewed with Brian details from the meeting on 8/28/06 | + | 5). Circuit Board Design: |
+ | DSC reviewed with Brian details from the meeting on 8/28/06 | ||
with Chris Cuevas and Elton regarding who will work on the FDC | with Chris Cuevas and Elton regarding who will work on the FDC | ||
circuit board design. | circuit board design. | ||
− | 6). We agreed that it is time to start to perform the load calculations | + | 6). Load Calculations: |
+ | We agreed that it is time to start to perform the load calculations | ||
for the frames supporting the wires. | for the frames supporting the wires. | ||
Minutes prepared by Daniel. Send any comments or corrections along. | Minutes prepared by Daniel. Send any comments or corrections along. |
Revision as of 11:44, 13 December 2006
FDC Weekly Meeting
Date: August 30, 2006
Participants: Daniel, Brian
Next Meeting: Wednesday, September 6, 2006 @ 1:30 p.m.
1). Cosmic Ray Chambers:
Simon has checked the cosmic chamber signals now that alcohol has been added. Things look much better now. Several chambers are being read out and a crude calibration is in place. More work will be done when Simon gets back from vacation.
2). Small-Scale Prototype:
Comparison of chamber resolution with stretched cathodes shows now change from before (i.e. compared to the old wrinkled planes).
3). Mechanical Drawings:
Brian showed his first mechanical drawing. Not much to talk about as drawing was 0th order. Brian will continue to work on this.
4). FDC Budget:
- Brian suggested that we discuss the FDC budget for next year at our next FDC meeting. We can then decide what we want to purchase. - DSC will send Brian the R&D budget numbers after the meeting.
5). Circuit Board Design:
DSC reviewed with Brian details from the meeting on 8/28/06 with Chris Cuevas and Elton regarding who will work on the FDC circuit board design.
6). Load Calculations:
We agreed that it is time to start to perform the load calculations for the frames supporting the wires.
Minutes prepared by Daniel. Send any comments or corrections along.