Difference between revisions of "Coil Test Weekly Meeting 22-Apr-2011"

From GlueXWiki
Jump to: navigation, search
m
 
 
Line 10: Line 10:
  
 
* Coil 3 cooldown status
 
* Coil 3 cooldown status
* Are we ready to power coil 3?
+
* Are we ready to power up and make measurements on coil 3?
 
** Danfysik power transistor, fault sequencer and slow dump
 
** Danfysik power transistor, fault sequencer and slow dump
 
** new wiring
 
** new wiring

Latest revision as of 14:49, 21 April 2011

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 22-Apr-2011 9:30 am ARC 231


Agenda

  • Coil 3 cooldown status
  • Are we ready to power up and make measurements on coil 3?
    • Danfysik power transistor, fault sequencer and slow dump
    • new wiring
    • PLC programming
    • VME-based fast DAQ system
  • Document trip chains
  • Testing in B field: VME/VXS crates, HV/LV crates, SiPM's
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • Coil 2 repair status
  • IRMIS
  • Preparing for moving into the hall