== Meeting Time and Place == | == Meeting Time and Place == | ||
− | Friday | + | Friday April 15, 2011 at 8:15am |
At Jefferson Lab, the meeting will be held in room ARC 231 | At Jefferson Lab, the meeting will be held in room ARC 231 | ||
Revision as of 07:47, 15 April 2011
Meeting Time and Place
Friday April 15, 2011 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231
Agenda
- ESH&Q minute - Hall D AHA
- Announcements - FDC Review, Collab mtg
- training -
- Manpower
- Space
- Budgets
- Solenoid Test Status *
- FDC construction update
- CAD update
- Upcoming work
- FDC Production** Solenoid coil 3 test
- solenoid coil 2 repair
- solenoid coil 2 test
- Collimator cave pedestal install
- Upstream Platform install
- BCAL wedge inspection
- BCAL readout prototype
- LCW installation
- Hall D cryogenics design
- Solenoid steel design/Fab
- Solenoid installation into Hall D
- BCAL assembly tooling design
- FCAL Platform Design
- Beamline vacuum design/fab/install
- Pair spec magnet modification
Outstanding Action Items
- need to get dipole (for sweep magnet) from FEL - Jim Coleman
- need to look at organizing someone to take care of material handling for Hall D. Can we use the transportainer?
- check to see if we can get a MS project group license - Tim
- Review upstream platform tie offs, fork maneuver, As builts. rail heights
Discussions
- In attendance W. Crahen, J. Fochtman, C. Hutton, V. Razmyslovich, J. Lagner, F. Martin, R. Getz, C. Heck, D. Butler, W. Sachleben, A. Johnson, G. Biallas, T. Carstens, Tim Whitlatch