Difference between revisions of "Coil Test Weekly Meeting 15-Apr-2011"

From GlueXWiki
Jump to: navigation, search
 
m
 
Line 9: Line 9:
 
'''Agenda'''
 
'''Agenda'''
  
* Coil 3 installation status
+
* Coil 3 installation status and cooldown schedule
* Improvements needed for coil 3
+
* Status of fixes/improvements
 
** Danfysik power transistor
 
** Danfysik power transistor
 
** quench detector
 
** quench detector
 
** document trip chains
 
** document trip chains
** trip sequence diagnosis system
 
 
** slow dump
 
** slow dump
 
** new wiring
 
** new wiring
* PLC system improvements
+
* PLC coding status
** additional licenses and modules
+
* VME-based fast DAQ system
* New VME-based fast DAQ system
+
** connection to I/O module, voltage division, overvoltage protection
** hardware status
+
** readout software status
** software status
+
* Testing in B field:  VME/VXS crates, HV/LV crates, SiPM's
** protecting VME board from over-voltage
+
* Other testing with coil 3
+
** VXS/VME crates in B field
+
** SiPM tests
+
 
* [[For_the_third_coil|To-do list]] for the next coil
 
* [[For_the_third_coil|To-do list]] for the next coil
 
** measure UPS lifetime under operating conditions
 
** measure UPS lifetime under operating conditions

Latest revision as of 15:52, 13 April 2011

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 15-Apr-2011 9:30 am ARC 231


Agenda

  • Coil 3 installation status and cooldown schedule
  • Status of fixes/improvements
    • Danfysik power transistor
    • quench detector
    • document trip chains
    • slow dump
    • new wiring
  • PLC coding status
  • VME-based fast DAQ system
    • connection to I/O module, voltage division, overvoltage protection
    • readout software status
  • Testing in B field: VME/VXS crates, HV/LV crates, SiPM's
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • Coil 2 repair status
  • IRMIS
  • Preparing for moving into the hall