Difference between revisions of "Mar 24, 2011 Calibration/Monitoring"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 16: | Line 16: | ||
= Tentative Agenda = | = Tentative Agenda = | ||
− | # | + | # Communications |
− | # | + | ## Summary of CAN protocol for Fcal bases (Paul) |
+ | ## Comments on Hall D slow controls (Elliott/Hovanes) | ||
+ | # Discussion of design (Elton) | ||
+ | # Updates from Athens (Christina) | ||
= Minutes = | = Minutes = | ||
''Attendees: | ''Attendees: |
Revision as of 09:13, 24 March 2011
Teleconference Time 11:00 EDT
- Connection: ESNET
Background information
- Monitoring R&D issues for the relative gain calibration and monitoring system for the calorimeters and possibly other detector systems.
- Calibration Specifications Table for BCAL, FCAL, TOF and START
- Calibration and Monitoring System Meetings Previous minutes
Action Items
- Can George calculate the % deviation from linearity on his plot?
-
Christina will probe Kapos for cabling and other board issues.
Tentative Agenda
- Communications
- Summary of CAN protocol for Fcal bases (Paul)
- Comments on Hall D slow controls (Elliott/Hovanes)
- Discussion of design (Elton)
- Updates from Athens (Christina)
Minutes
Attendees: