Difference between revisions of "Coil Test Weekly Meeting 18-Mar-2011"

From GlueXWiki
Jump to: navigation, search
m
m
Line 16: Line 16:
 
** quench detector
 
** quench detector
 
** evaluating trip sequence
 
** evaluating trip sequence
 +
** slow dump still not working
 
** other new wiring
 
** other new wiring
 
* [[For_the_third_coil|To-do list]] for the next coil
 
* [[For_the_third_coil|To-do list]] for the next coil

Revision as of 11:39, 16 March 2011

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 18-Mar-2011 9:30 am ARC 428

NOTE: we are meeting in ARC 428 this week!


Agenda

  • Coil 3 installation status
  • Improvements needed for coil 3 testing
    • quench detector
    • evaluating trip sequence
    • slow dump still not working
    • other new wiring
  • To-do list for the next coil
  • Coil 2 repair status
  • IRMIS
  • Preparing for moving into the hall