=Items for followup from previous meeting= | =Items for followup from previous meeting= | ||
− | # | + | # Power supply. Current ~ 15KA, voltage 5-10 V. (Could existing power supply 3KA/10V be converted to 6KA/5V?) |
+ | #* Elton can obtain cost estimates for this power supply | ||
+ | # Cryogenic plant | ||
+ | #* Primary circuit: Forced flow He at 4.5K, < 10g/s, ~5-10 bar, pressure drop < 2 bar. | ||
+ | #* Secondary circuit: Deliver intermediate temperature He gas at 20-70 K to HTS vapor cooled current leads | ||
+ | #* Jonathan will investigate feasibility/cost of modifying existing refrigerator or purchasing new to deliver these requirements. Provide details to Ettore | ||
+ | # High-current HTS (17KA) vapor cooled leads | ||
+ | #* Ettore will provide this information based on Sultan design | ||
+ | # Fast protection system (external), with response time of ~0.5 s. | ||
+ | #* Commercial 4 parallel breakers 5KA each (20KA total), 2KV max. Two independent systems for redundancy | ||
+ | #* Ettore will obtain details of these existing systems. | ||
= Tentative Agenda = | = Tentative Agenda = |
Revision as of 08:39, 11 February 2011
Items for followup from previous meeting
- Power supply. Current ~ 15KA, voltage 5-10 V. (Could existing power supply 3KA/10V be converted to 6KA/5V?)
- Elton can obtain cost estimates for this power supply
- Cryogenic plant
- Primary circuit: Forced flow He at 4.5K, < 10g/s, ~5-10 bar, pressure drop < 2 bar.
- Secondary circuit: Deliver intermediate temperature He gas at 20-70 K to HTS vapor cooled current leads
- Jonathan will investigate feasibility/cost of modifying existing refrigerator or purchasing new to deliver these requirements. Provide details to Ettore
- High-current HTS (17KA) vapor cooled leads
- Ettore will provide this information based on Sultan design
- Fast protection system (external), with response time of ~0.5 s.
- Commercial 4 parallel breakers 5KA each (20KA total), 2KV max. Two independent systems for redundancy
- Ettore will obtain details of these existing systems.
Tentative Agenda
- Background (Elton)
- Discussion of items Ettore sent via e-mail
Minutes
Attending: