''Attending: Ettore, Elton, George, Tim, Jonathan, Elliott
+
''Attending:
 
+
# Discussion of implication of cable-in-conduit conductor (CICC) choice on infrastructure in four main areas
+
## Power supply. Current ~ 15KA, voltage 5-10 V. (Could existing power supply 3KA/10V be converted to 6KA/5V?)
+
##* Elton can obtain cost estimates for this power supply
+
## Cryogenic plant
+
##* Primary circuit: Forced flow He at 4.5K, < 10g/s, ~5-10 bar, pressure drop < 2 bar.
+
##* Secondary circuit: Deliver intermediate temperature He gas at 20-70 K to HTS vapor cooled current leads
+
##* Jonathan will investigate feasibility/cost of modifying existing refrigerator or purchasing new to deliver these requirements
+
## High-current HTS (17KA) vapor cooled leads
+
##* Ettore will provide this information based on Sultan design
+
## Fast protection system (external), with response time of ~0.5 s.
+
##* Commercial 4 parallel breakers 5KA each (20KA total), 2KV max. Two independent systems for redundancy
+
##* Ettore will obtain details of these existing systems.
+
# Jonathan will provide details of the cryo plant to Ettore
+
# George mentioned that the G0 CICC conductor may have been operated at reduced pressure and lower current, which may be more compatible with standard JLab operation.
+

Revision as of 08:35, 11 February 2011

Items for followup from previous meeting

  1. None

Tentative Agenda

  1. Background (Elton)
  2. Discussion of items Ettore sent via e-mail

Minutes

Attending: