Line 35: Line 35:
 
*** bring test points to front panel
 
*** bring test points to front panel
 
*** use matched resistors
 
*** use matched resistors
 +
*** will quench detector work for coil 4?
 
** use new sensor for vapor-cooled lead voltage drop
 
** use new sensor for vapor-cooled lead voltage drop
 
** isolation and current-loop readout for critical signals
 
** isolation and current-loop readout for critical signals

Revision as of 15:35, 17 December 2010

  • Basic questions
    • lag between field and current...are there turn-to-turn shorts in coil 1?
    • what worked, what didn't for coil 1?
    • what should we do differently for the next coil?
      • what coil will we test next?
      • will we open up coil 4?
    • what might we consider doing differently in the hall?
    • prioritize into "must-haves", "should-haves" and "would-like-to-haves"
    • have we documented our experience?


  • Puzzles and problems to be addressed before next coil test
    • improve cryo system
      • minimize ice buildup
      • more heating/insulation on N2 vent line
      • do we need cold traps?
    • field polarity reversed
    • sub-coil inductances appear to be backwards
    • inductance seen on splices
    • USB device wiring problems
    • other wiring, cable and connector problems
    • total coil inductance disagreement
    • use matched current-limiting resistors
    • dynamic range adjustments
    • noise elimination
    • slow dump doesn't work
    • understand fast dump circuit
      • measure fast dump resistances
    • understand Danfysik ramp-down mechanism
    • vapor-cooled lead blockage
      • can anything be done to avoid another one?
      • cold traps to prevent blockage?
      • heaters to melt blockage?
    • improve ability to adjust quench detector
      • bring test points to front panel
      • use matched resistors
      • will quench detector work for coil 4?
    • use new sensor for vapor-cooled lead voltage drop
    • isolation and current-loop readout for critical signals
      • interaction via Zener and Dataforth clipping
    • UPS on Danfysik boards and contactor
    • improve PLC cryo and MPS algorithms (in preparation for non-expert use)
      • simplify many operations
    • improve PLC early problem detection
    • improve PLC cryo control under varying CTF operating conditions
    • add more HMI screens (may need license upgrade)
    • simplify existing screens
    • additional HMI license, get second computer working
      • dual-redundant HMI server or another machine for the server
      • HMI development machine and license
      • contact A-B salesman about licenses
      • change HMI database
    • more pre-defined trend plots
    • did we ever implement guard shack notification?
    • automated elog entries
    • update drawings and documentation
    • where is manpower to make improvements?
    • what else?