Difference between revisions of "For the second coil"

From GlueXWiki
Jump to: navigation, search
m
m
Line 1: Line 1:
 
* Basic questions
 
* Basic questions
 +
** lag between field and current...are there turn-to-turn shorts?
 
** what worked, what didn't for coil 1?
 
** what worked, what didn't for coil 1?
 
** what should we do differently for the next coil?
 
** what should we do differently for the next coil?
Line 10: Line 11:
 
* Puzzles and problems to be addressed before next coil test
 
* Puzzles and problems to be addressed before next coil test
 
** improve cryo system
 
** improve cryo system
 +
*** minimize ice buildup
 +
*** more heating/insulation on N2 vent line
 
*** cold traps
 
*** cold traps
 
** field polarity reversed
 
** field polarity reversed
Line 17: Line 20:
 
** other wiring, cable and connector problems
 
** other wiring, cable and connector problems
 
** total coil inductance disagreement
 
** total coil inductance disagreement
 +
** dynamic range adjustments
 +
** noise elimination
 
** slow dump doesn't work
 
** slow dump doesn't work
 
** understand fast dump circuit
 
** understand fast dump circuit

Revision as of 12:53, 17 December 2010

  • Basic questions
    • lag between field and current...are there turn-to-turn shorts?
    • what worked, what didn't for coil 1?
    • what should we do differently for the next coil?
      • what coil will we test next?
    • what might we consider doing differently in the hall?
    • distinguish between "must haves" vs "should haves" vs "would like to haves"
    • have we documented our experience?


  • Puzzles and problems to be addressed before next coil test
    • improve cryo system
      • minimize ice buildup
      • more heating/insulation on N2 vent line
      • cold traps
    • field polarity reversed
    • sub-coil inductances appear to be backwards
    • inductance seen on splices
    • USB device wiring problems
    • other wiring, cable and connector problems
    • total coil inductance disagreement
    • dynamic range adjustments
    • noise elimination
    • slow dump doesn't work
    • understand fast dump circuit
      • measure fast dump resistances
    • understand Danfysik ramp-down mechanism
    • vapor-cooled lead blockage
      • can anything be done to avoid another one?
      • cold traps
      • heaters
    • improve ability to adjust quench detector
      • bring test points to front panel
      • use matched resistors
    • use new sensor for vapor-cooled lead voltage drop
    • isolation and current-loop readout for critical signals
      • interaction via Zener and Dataforth clipping
    • UPS on Danfysik boards and contactor
    • improve PLC cryo and MPS algorithms (in preparation for non-expert use)
      • simplify many operations
    • improve PLC early problem detection
    • improve PLC cryo control under varying CTF operating conditions
    • add more HMI screens (may need license upgrade)
    • simplify existing screens
    • additional HMI license, get second computer working
    • more pre-defined trend plots
    • did we ever implement guard shack notification?
    • automated elog entries
    • update drawings and documentation
    • where is manpower to make improvements?
    • what else?