Difference between revisions of "Minutes-12-16-2010"
From GlueXWiki
Line 13: | Line 13: | ||
# Engineering (Bill, David, Lubomir) | # Engineering (Bill, David, Lubomir) | ||
#* Wire stringing table and movement system control | #* Wire stringing table and movement system control | ||
− | #* Position and tension measurements [http://www.jlab.org/Hall-D/detector/fdc/pictures/Dsc05389_2.jpg] | + | #* Position and tension measurements [http://www.jlab.org/Hall-D/detector/fdc/pictures/Dsc05389_2.jpg], [http://www.jlab.org/Hall-D/detector/fdc/pictures/Dsc05400_2.jpg] |
#* Other | #* Other | ||
# Full-scale prototype (Beni, Lubomir) | # Full-scale prototype (Beni, Lubomir) |
Revision as of 10:42, 16 December 2010
December 16, 2010 FDC meeting
Tentative Agenda
- Production (David)
- Blue Crab status
- ETC change request for FDC Tim's new schedule
- Electronics (Fernando, Chris, Roger)
- PCB inspection
- Cathode foil production and inspection
- Rigid-flex status
- Other
- Engineering (Bill, David, Lubomir)
- Full-scale prototype (Beni, Lubomir)
- Studies with methane admixture
- Other