Difference between revisions of "Jan 6, 2010 Calorimetry"
From GlueXWiki
(→Items for followup from previous meeting(s)) |
|||
(One intermediate revision by the same user not shown) | |||
Line 15: | Line 15: | ||
# Monitoring | # Monitoring | ||
#* Specifications for BCAL [[Monitoring R&D]] (Zisis, Elton, Christina) | #* Specifications for BCAL [[Monitoring R&D]] (Zisis, Elton, Christina) | ||
− | |||
#* IU: checking cross talk of calibration inputs across modules. | #* IU: checking cross talk of calibration inputs across modules. | ||
# Fcal construction | # Fcal construction | ||
#* Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan. | #* Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan. | ||
− | #* | + | #* Zisis/George to send Elton shipping specifications as example for specifying Pb shipments |
− | #* | + | #* Mechanical: Tim has promised review of support structure. |
# SiPMs | # SiPMs | ||
#* IU: simulation using geometry for summed units | #* IU: simulation using geometry for summed units |
Latest revision as of 13:54, 9 December 2010
Teleconference Time: 10:30 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337
- Regina Phone: in LB228 is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Items for followup from previous meeting(s)
- Monitoring
- Specifications for BCAL Monitoring R&D (Zisis, Elton, Christina)
- IU: checking cross talk of calibration inputs across modules.
- Fcal construction
- Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan.
- Zisis/George to send Elton shipping specifications as example for specifying Pb shipments
- Mechanical: Tim has promised review of support structure.
- SiPMs
- IU: simulation using geometry for summed units
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration
- Requirements for BCAL monitoring: summary points and Monitoring System Requirements (Christina, Elton and Zisis)
- FCAL
- Construction Status
- BCAL
- Construction Status
- Simulations
- Readout segmentation (summing, towers vs quadrants/blocks)
- Reconstruction
- Other Updates