Difference between revisions of "Dec 2, 2010 Readout"
From GlueXWiki
(→Minutes) |
|||
(9 intermediate revisions by 2 users not shown) | |||
Line 15: | Line 15: | ||
# Collect this information of testing (including goals and setup) on the wiki for ease of presenting information. (USM) | # Collect this information of testing (including goals and setup) on the wiki for ease of presenting information. (USM) | ||
# Resolution including summing SiPMs (IU) | # Resolution including summing SiPMs (IU) | ||
− | # Elton to | + | # <strike> Elton to send timeline for project to Will for feedback. </strike> Note: Detailed schedule for testing still needed. |
+ | # <strike> Will to send draft sow to Elton for feedback. </strike> | ||
# Elton to investigate the options for transfering laser to UofR for future tests | # Elton to investigate the options for transfering laser to UofR for future tests | ||
Line 25: | Line 26: | ||
# Review of Action Items | # Review of Action Items | ||
# Update - USM | # Update - USM | ||
− | |||
# SiPM update | # SiPM update | ||
− | #* | + | #* Preparations for testing |
− | #* | + | #* Regina preparations |
# Electronics/cooling (Fernando) | # Electronics/cooling (Fernando) | ||
− | # Geometry and light guides | + | # Geometry and light guides= Tentative Agenda = |
− | # | + | |
− | # | + | = Minutes = |
+ | ''Attending: Elton, Beni, Chuck, Jim, John (JLab); Will (USM); Zisis, George, Andrei (UofR); | ||
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | # Update - USM (Will) | ||
+ | ## Received 2nd small milling machine. Larger one on order. Setback with personnel. Student/engineer responsible for light guides and dark box will concentrate on one project. | ||
+ | ## Testing board for electronics awaiting parts that are likely in customs | ||
+ | ## All materials for dark box are in hand, except for the copper cooling plate that needs machining. | ||
+ | ## Reminder to JLab to ship SiPM array for testing. | ||
+ | ## Alam is updating SiPM tester to be more modular | ||
+ | # SiPM update | ||
+ | ## Preparations for testing | ||
+ | ##* Carl is preparing the test setup for First Article testing of SiPMs | ||
+ | ##* Mechanical cooling system under design including concept for prototype | ||
+ | ## Regina preparations | ||
+ | ##* New masters student will work on SiPMs | ||
+ | ##* Kathryn Janzen will come down to Regina from Saskatoon to help get tests up and running. | ||
+ | ##* Elton Asked about the laser. It is a 375 nm UV diode laser with variable intensity and pulse rate between 2.5 and 42 MHz. Together with a calibrated photodiode to determine absolute photon flux at high intensity, the laser can be used at low intensity to measure PDE. | ||
+ | # Electronics/cooling (Fernando) | ||
+ | ## Fernando responsible for the pre-amp/summing electronics board | ||
+ | ## Jack McKisson responsible for the bias/temperature compensation board | ||
+ | # Geometry and light guides | ||
+ | ## Envelop and geometry for electronic boards needs to be coordinated between Fernando and Chuck/Jim. | ||
+ | ## Mechanical prototype |
Latest revision as of 13:01, 2 December 2010
Teleconference Time: 10:30 a.m. EST
- ESNET 8542553 and EVO session
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
- Collect this information of testing (including goals and setup) on the wiki for ease of presenting information. (USM)
- Resolution including summing SiPMs (IU)
-
Elton to send timeline for project to Will for feedback.Note: Detailed schedule for testing still needed. -
Will to send draft sow to Elton for feedback. - Elton to investigate the options for transfering laser to UofR for future tests
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Update - USM
- SiPM update
- Preparations for testing
- Regina preparations
- Electronics/cooling (Fernando)
- Geometry and light guides= Tentative Agenda =
Minutes
Attending: Elton, Beni, Chuck, Jim, John (JLab); Will (USM); Zisis, George, Andrei (UofR);
- Announcements
- Review of Action Items
- Update - USM (Will)
- Received 2nd small milling machine. Larger one on order. Setback with personnel. Student/engineer responsible for light guides and dark box will concentrate on one project.
- Testing board for electronics awaiting parts that are likely in customs
- All materials for dark box are in hand, except for the copper cooling plate that needs machining.
- Reminder to JLab to ship SiPM array for testing.
- Alam is updating SiPM tester to be more modular
- SiPM update
- Preparations for testing
- Carl is preparing the test setup for First Article testing of SiPMs
- Mechanical cooling system under design including concept for prototype
- Regina preparations
- New masters student will work on SiPMs
- Kathryn Janzen will come down to Regina from Saskatoon to help get tests up and running.
- Elton Asked about the laser. It is a 375 nm UV diode laser with variable intensity and pulse rate between 2.5 and 42 MHz. Together with a calibrated photodiode to determine absolute photon flux at high intensity, the laser can be used at low intensity to measure PDE.
- Preparations for testing
- Electronics/cooling (Fernando)
- Fernando responsible for the pre-amp/summing electronics board
- Jack McKisson responsible for the bias/temperature compensation board
- Geometry and light guides
- Envelop and geometry for electronic boards needs to be coordinated between Fernando and Chuck/Jim.
- Mechanical prototype