| * Thu 4-Nov-2010 9:30 am ARC 428 | | * Thu 4-Nov-2010 9:30 am ARC 428 |
− | | + | '''Canceled due to coil test startup''' |
− | | + | |
− | '''Agenda''' | + | |
− | | + | |
− | * [http://www.jlab.org/~wolin/DirReviewReport_Oct-2010.docx Aftermath] of Director's Review - George, Mark, Josh, Jonathan, Elliott
| + | |
− | ** redundancy in quench detection and other systems
| + | |
− | ** redundant breaker in fast/slow interlock chains
| + | |
− | ** high-speed DAQ for diagnosis of electrical problems
| + | |
− | ** UPS on power supply control system
| + | |
− | ** what needs to be done for the test vs for the experiment?
| + | |
− | * PI Responsibilities during test - Jonathan
| + | |
− | ** Low power magnet testing 5A, 50A,100A - Elliott
| + | |
− | ** High power magnet testing 100-1500A - Elliott
| + | |
− | ** Identify possible turn to turn shorts during ramping - Eugene
| + | |
− | ** Assess Heim column centering in coil - George
| + | |
− | ** Assess Axial column forces - George
| + | |
− | ** Estimate LN2 and He heat leak - Jonathan
| + | |
− | ** Assess LN2 and LHe thermal siphons - Jonathan
| + | |
− | * OSP status - Elliott
| + | |
− | * Hall probe - Mark S
| + | |
− | * Installation and commissioning status - all
| + | |
− | ** pressure testing and certifications
| + | |
− | ** pumping/purging
| + | |
− | ** connection to cryo system
| + | |
− | ** ODH on platform?
| + | |
− | ** vacuum gate valve status
| + | |
− | ** what else?
| + | |
− | * Magnet power supply and interlock commissioning - Mark S
| + | |
− | ** quench protector wiring
| + | |
− | ** shunt
| + | |
− | ** ground fault detection
| + | |
− | ** should strain gauges be in interlock system?
| + | |
− | * Controls racks - Scot
| + | |
− | ** fast dump crash button?
| + | |
− | ** strain gauge and UPS interlocks
| + | |
− | ** commissioning
| + | |
− | ** hook up redundant sensors
| + | |
− | ** anything else?
| + | |
− | * PLC programming/testing status - Mark W
| + | |
− | ** magnet ramp down mechanism
| + | |
− | ** UPS interlock
| + | |
− | ** what's left?
| + | |
− | ** another tutorial
| + | |
− | * EPICS - Hovanes
| + | |
− | ** communication with Cryo Group
| + | |
− | ** connection to guard shack and notification conditions
| + | |
− | ** [[pager_status_10_21_2010 | pager status ]] and strategy
| + | |
− | * HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
| + | |
− | ** PID screens
| + | |
− | ** program access to archived data
| + | |
− | ** another tutorial
| + | |
− | * Coil repair status - George
| + | |
− | * Learn how to use Linux for web and email - Elliott
| + | |
− | * Solenoid review 7-Dec
| + | |
− | * Purchase of another PLC and Ethernet module - Elliott
| + | |
− | * Hall D Technical web page
| + | |
− | * Preparations for testing next coil - George, Scot, Elliott
| + | |
− | ** update P&I
| + | |
− | ** splices
| + | |
− | ** yoke location
| + | |
− | ** piping adaptors
| + | |
− | ** downstream yoke spacers
| + | |
− | ** controls racks rewiring
| + | |
− | ** quench detector connections
| + | |
− | ** connectors on next coil
| + | |
− | ** what else?
| + | |