Difference between revisions of "Aug 26, 2010 Readout"
From GlueXWiki
(→Minutes) |
|||
Line 39: | Line 39: | ||
= Minutes = | = Minutes = | ||
− | Attendees: Eugene | + | Attendees: Eugene, Beni, Yi, John, Elton, (JLab), Andrei, Zisis (Regina); Will (local), Alam (USM); Zisis, Andrei (UofR); |
# Announcements | # Announcements | ||
# Review of Action Items | # Review of Action Items | ||
+ | ## | ||
# Update - USM | # Update - USM | ||
#* SiPM test stand (Alam) | #* SiPM test stand (Alam) |
Revision as of 14:24, 26 August 2010
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone in CC L207 is 757-269-7084
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
- Testing goals and setup (Serguei)
- Will to find out if there is any feedback from USM on terms and conditions from our procurement package.
- Will to update statement of work for USM contract and develop detailed schedule.
- Collect this information of testing on the wiki for ease of presenting information. (USM)
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Update - USM
- SiPM test stand (Alam)
- Status of statement of work (SOW)
- SiPM Radiation Hardness Test (Update from Yi)
- Electronics/cooling
- Geometry
- Simulation runs
- Cosmic-ray setup at UofR
- Light guides
- Collaboration Meeting (Five 25-min sessions allocated), some topics...
- SiPM report
- Bcal construction
- Fcal construction
- Preparations at USM
- Decisions: Fcal insert, monitoring/calibration
Minutes
Attendees: Eugene, Beni, Yi, John, Elton, (JLab), Andrei, Zisis (Regina); Will (local), Alam (USM); Zisis, Andrei (UofR);
- Announcements
- Review of Action Items
- Update - USM
- SiPM test stand (Alam)
- Status of statement of work (SOW)
- SiPM Radiation Hardness Test (Update from Yi)
- Electronics/cooling
- Geometry
- Simulation runs
- Cosmic-ray setup at UofR
- Light guides
- Collaboration Meeting (Five 25-min sessions allocated), some topics...
- SiPM report
- Bcal construction
- Fcal construction
- Preparations at USM
- Decisions: Fcal insert, monitoring/calibration