Difference between revisions of "Minutes-8-19-2010"
From GlueXWiki
Line 4: | Line 4: | ||
# Production | # Production | ||
− | #* | + | #* Clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions] |
− | #* | + | #* Equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx David's list] |
+ | #* Defect possibilities [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Defect_Possibilities.docx Mark&Casey's list] | ||
# Electronics (Fernando) | # Electronics (Fernando) | ||
#* update on first article PCBs | #* update on first article PCBs | ||
Line 12: | Line 13: | ||
#* Cathode foil: sole source procurement status (Roger) [http://www.jlab.org/Hall-D/detector/fdc/documents/PD_14_Sole_Source_Justification.docx form], [http://www.jlab.org/Hall-D/detector/fdc/documents/PCB_PR294196_Flood-Sole_Source_Questions_8-11-10.docx PR 294196 questions] | #* Cathode foil: sole source procurement status (Roger) [http://www.jlab.org/Hall-D/detector/fdc/documents/PD_14_Sole_Source_Justification.docx form], [http://www.jlab.org/Hall-D/detector/fdc/documents/PCB_PR294196_Flood-Sole_Source_Questions_8-11-10.docx PR 294196 questions] | ||
#* Wire stringing update (Bill) | #* Wire stringing update (Bill) | ||
− | #* Other: granite tables, update from UVA | + | #* Other: granite tables, update from UVA, returning the tent in 126 to HallA |
# Full-scale prototype tests: update (Beni) | # Full-scale prototype tests: update (Beni) | ||
# Other: talks at the collaboration meeting | # Other: talks at the collaboration meeting |
Revision as of 12:32, 18 August 2010
August 5, 2010 FDC meeting
Tentative Agenda
- Production
- Clean room requirement changes: Ron Bartek's suggestions
- Equipment/materials needed for the production David's list
- Defect possibilities Mark&Casey's list
- Electronics (Fernando)
- update on first article PCBs
- other
- Engineering
- Cathode foil: sole source procurement status (Roger) form, PR 294196 questions
- Wire stringing update (Bill)
- Other: granite tables, update from UVA, returning the tent in 126 to HallA
- Full-scale prototype tests: update (Beni)
- Other: talks at the collaboration meeting