Difference between revisions of "Minutes-8-19-2010"
From GlueXWiki
Line 10: | Line 10: | ||
#* Cathode foil: procurement status (Roger) | #* Cathode foil: procurement status (Roger) | ||
#* Wire stringing update (Bill) | #* Wire stringing update (Bill) | ||
− | # Full-scale prototype tests | + | # Full-scale prototype tests: update (Beni) |
− | + | # Other: talks at the collaboration meeting | |
− | + | ||
− | + | ||
− | # Other: | + | |
<!-- | <!-- |
Revision as of 17:59, 17 August 2010
August 5, 2010 FDC meeting
Tentative Agenda
- Production
- clean room requirement changes: Ron Bartek's suggestions
- equipment/materials needed for the production David's list
- Electronics: update (Fernando)
- Engineering
- Cathode foil: procurement status (Roger)
- Wire stringing update (Bill)
- Full-scale prototype tests: update (Beni)
- Other: talks at the collaboration meeting