Difference between revisions of "Minutes-8-19-2010"
From GlueXWiki
Line 5: | Line 5: | ||
# Production | # Production | ||
#* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions] | #* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions] | ||
− | #* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/ | + | #* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx Casey's list] |
# Electronics: update (Fernando) [http://argus.phys.uregina.ca/gluex/DocDB/0015/001567/001/FDC%20PCB%20QA.pdf doc1567] | # Electronics: update (Fernando) [http://argus.phys.uregina.ca/gluex/DocDB/0015/001567/001/FDC%20PCB%20QA.pdf doc1567] | ||
# Engineering | # Engineering |
Revision as of 17:54, 17 August 2010
August 5, 2010 FDC meeting
Tentative Agenda
- Production
- clean room requirement changes: Ron Bartek's suggestions
- equipment/materials needed for the production Casey's list
- Electronics: update (Fernando) doc1567
- Engineering
- Cathode foil: flex soldering/gluing, procurement status (Roger) [3M conductive film]
- Mylar window thickness
- Wire stringing update (Bill)
- Full-scale prototype tests [FDC Log Book, pages 509-512]
- oxygen contamination measurements (Beni)
- cosmic test update (Beni)
- wire resolution results
- Other: FDC paper