Difference between revisions of "Minutes-8-5-2010"
From GlueXWiki
Line 32: | Line 32: | ||
== Electronics == | == Electronics == | ||
− | - | + | - Fernando |
== Engineering == | == Engineering == |
Revision as of 17:41, 5 August 2010
August 5, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- equipment/materials needed for the production Casey's list
- Electronics: update (Fernando) doc1567
- Engineering
- Cathode foil: flex soldering/gluing, procurement status (Roger) [3M conductive film]
- Mylar window thickness
- Wire stringing update (Bill)
- Full-scale prototype tests [FDC Log Book, pages 509-512]
- oxygen contamination measurements (Beni)
- cosmic test update (Beni)
- wire resolution results
- Other