Difference between revisions of "Minutes-8-5-2010"
From GlueXWiki
Line 20: | Line 20: | ||
= Minutes = | = Minutes = | ||
− | Participants: Eugene, Fernando, Glenn, Roger, Casey, Mark, | + | Participants: Eugene, Fernando, David, Glenn, Bill, Roger, Casey, Mark, Chuck, Beni, Simon, and Lubomir. |
− | + | ||
+ | We welcomed the new FDC construction coordinator, David Butler. | ||
== Production == | == Production == | ||
− | - | + | - Bill: probably there will be a delay with the clean room construction, because some of the specifications (like +/-2% humidity control) were not realistic, which delays the bidding process. Eugene: the leading time is about 3 months, so expect it ready by December, although they will try to speed up the construction. |
− | - | + | - Casey created a list of equipment and materials needed for the production. Everybody is encouraged to look at the link above. We discussed what type of microscope we need for the wire and flex soldering. Casey who is expected to be the main user wanted to have bigger working distance than the new Fernando's microscope. It will be nice also to have |
== Electronics == | == Electronics == |
Revision as of 17:33, 5 August 2010
August 5, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- equipment/materials needed for the production Casey's list
- Electronics: update (Fernando)
- Engineering
- Cathode foil: flex soldering/gluing, procurement status (Roger) [3M conductive film]
- Mylar window thickness
- Wire stringing update (Bill)
- Full-scale prototype tests [FDC Log Book, pages 509-512]
- oxygen contamination measurements (Beni)
- cosmic test update (Beni)
- wire resolution results
- Other