Difference between revisions of "Minutes-8-5-2010"
From GlueXWiki
Line 5: | Line 5: | ||
# Production | # Production | ||
#* 727 B.C. status | #* 727 B.C. status | ||
− | #* equipment for the production | + | #* equipment/materials needed for the production |
# Electronics: update (Fernando) | # Electronics: update (Fernando) | ||
# Engineering | # Engineering | ||
− | #* Cathode foil: soldering, procurement status (Roger) | + | #* Cathode foil: flex soldering/gluing, procurement status (Roger) |
#* Wire stringing update (Bill) | #* Wire stringing update (Bill) | ||
# Full-scale prototype tests | # Full-scale prototype tests |
Revision as of 15:22, 4 August 2010
August 5, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- equipment/materials needed for the production
- Electronics: update (Fernando)
- Engineering
- Cathode foil: flex soldering/gluing, procurement status (Roger)
- Wire stringing update (Bill)
- Full-scale prototype tests
- oxygen contamination measurements (Beni)
- cosmic test update (Beni)
- wire resolution results
- Other