'''Agenda''' | '''Agenda''' | ||
− | * | + | * Controls installation status - Scot, Mark S, Elliott |
** racks and computers | ** racks and computers | ||
** power | ** power | ||
** networking | ** networking | ||
** telephone | ** telephone | ||
− | |||
* Magnet power supply and interlock commissioning - Cody | * Magnet power supply and interlock commissioning - Cody | ||
** flow pressure and rates, flow switches | ** flow pressure and rates, flow switches | ||
Line 22: | Line 21: | ||
* PLC programming/testing status - Mark W | * PLC programming/testing status - Mark W | ||
** what else is left to do besides testing? | ** what else is left to do besides testing? | ||
+ | ** backup PLC programmer? | ||
* UPS status - Mark W, Elliott | * UPS status - Mark W, Elliott | ||
** relay modules, use in interlock system | ** relay modules, use in interlock system | ||
Line 33: | Line 33: | ||
** Two weeks notice to Errol - when? | ** Two weeks notice to Errol - when? | ||
** backup power in Test Lab? | ** backup power in Test Lab? | ||
+ | * Test plan - Josh | ||
* Coil repair status - George | * Coil repair status - George | ||
* OSP documents and review - Elliott, George | * OSP documents and review - Elliott, George |
Latest revision as of 13:41, 27 July 2010
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 29-Jul-2010 9:30am ARC 428
Agenda
- Controls installation status - Scot, Mark S, Elliott
- racks and computers
- power
- networking
- telephone
- Magnet power supply and interlock commissioning - Cody
- flow pressure and rates, flow switches
- interlock on strain gauges?
- Controls racks - Scot
- what else is left to do?
- PLC programming/testing status - Mark W
- what else is left to do besides testing?
- backup PLC programmer?
- UPS status - Mark W, Elliott
- relay modules, use in interlock system
- connection to PLC?
- EPICS <--> PLC communications - Wesley, Elliott
- connection to guard shack
- HMI and EWEB programming - Yi, Elliott
- Installation status - George, Mark S
- rigging, platform and stand, etc.
- cryo can
- Two weeks notice to Errol - when?
- backup power in Test Lab?
- Test plan - Josh
- Coil repair status - George
- OSP documents and review - Elliott, George